Currently one
mining and sixteen exploration
companies are operating in Eritrea.
The total area covered by licenses is 15,627
square kilometers (mining - 39 and exploration - 15,588) comprising
approximately 12.5 % of the
country's land coverage. In addition to this the Ministry has received
applications from six companies for precious, base metal and potash in
different parts of the country. This
covers another 23,000 square
kilometers of land, which if granted will increase the percentage of land
coverage by mineral tenements to 31percent.
The details of companies and their activities currently operating and applying
for new tenement in Eritrea
are briefly described below. To find a free space to apply for a new area see
the Mineral concession map of Eritrea
As a result of exploration, since the first batch of
licenses were awarded in mid 1990's, a
resource in excess of 117 million tons
has been defined ranging from inferred to proven and containing over 3 million ounces of gold, 41million ounces of silver, 2.2 billion pounds of copper and 4.1 billion pounds of zinc.
Bisha Mining Share Company
The Bisha
deposit is a large precious metal and base metal-rich volcanogenic massive
sulphide and is a joint venture between Eritrea's
ENAMCO and Canada's
Nevsun Resources Ltd .
Work is
going on as according to schedule with a completion of at least 52% of the
housing and infrastructure for the Project and assembly of the Process Plant are
well advanced. Most of the machineries
necessary for the mining operations have been imported and delivered. In
addition Work has started on tailing storage facility and Pre-strip of the
ground for mining operations . Generally it's believed that Mining
Operation will start as planned by the end of 2010.
Average production will
be:
Average production of Years 1 and 2 will be 431,000 oz Gold and 702,000 oz Silver per year
and average production of Years 3 to 5 will be 170 million lb Copper per year Plus precious metal credits
Average production of Years 6 to 10: will be 220 million lb Zinc and 40 millon Ib copper per year Plus precious metal credits
Sub-Sahara Resources (Chalice Gold Mines Limited) ASX Code: CHN
Sub-Sahara has
been actively exploring in Eritrea
for the past eight years and recently the company and its activities have been
acquired by Chalice Gold Mines. The company is focused on the Gold potential in
its Zara Gold Project in the north-west part of the country.
So far Scoping
study has been completed and bankable feasibility study has reached an advanced
stage. A resource estimation conducted by
JORC puts the potential to around 944,000oz at 5.8g/t Au and targeting
initial high‐margin production, the deposit is expected to yield at least
660,000oz gold total in it's expected mine lifetime of around 6 years. Its forecasted
US$424/oz cash operating costs will be required to develop it. The area has
high potential because of it's location in the strategic footprint in emerging
Arabian‐Nubian gold & base metal province.
Sunridge Gold Corporation [SGC: TSX.V]
The work thus far
done by Sunridge, a Canadian mineral exploration and development company, has
resulted in the definition of four NI 43-101 compliant resources on the Asmara
Project with total combined metal content of 1.3 million pounds of copper, 2.5
million pounds of zinc, 1.1 million ounces of gold and 32 million ounces of silver.
The largest
deposit is the 63 million tone Emba Derho copper-zinc-gold VMS deposit that is
located just 12 kilometers from Asmara.
An independent positive Preliminary Economic Assessment study was completed in
June 2009 which shows that the deposit has the potential to become a large
open-pit mine producing 60 million pounds of copper, 133 million pounds of zinc
and 21,000 ounces of gold per year. A Pre-Feasibility Study on the Emba Derho
deposit has been completed. Social
and Environmental Baseline studies at Emba derho,
Organizing Public Consultation and Workshops to stakeholders and further
geological works are also underway to enrich the knowledge on the deposit.
The Asmara Project
is considered to be a VMS district with many yet undrilled targets that warrant
further exploration work. Sunridge plans to drill several of these targets in
the near future.
On it's Debarwa
licence area, extensions were made to the north and south of the already
existing concession and Geochemical, Geophysical
(AMT Survey), Baseline studies and
Environmental studies are underway.
Contacts and
discussions were made with several companies to help finance the development of
the company's concession areas and an agreement subsequently signed with
FTSE-100 listed Antofagasta Plc of Chile. A deal was signed worth
$US10 million to fund exploration work, and $US5 million investment to become
the largest shareholder in the company.
Sanu Resources (NGEX Resources
Inc) [ CA: NGQ]
Based on the
previous detail exploration works (geological mapping, geochemical and
geophysical), Sanu continued its exploration activities in the Kerkebet and
Mogoraib exploration licenses targeting VMS deposits despite the massive
collapse of the world economy.
Generally most of
the works that Sanu accomplished during January to July 2009 are data base
entry, geological mapping and map compilation and some follow up and
prospecting works in the Kerkebet and Mogoraib licenses.
The most
significant activity during the year consisted of preparation of a 43-101
compliant resource calculation of the Hambok deposit. The Hambok resource
estimate was prepared by G.H. Giroux of Giroux Consultants Ltd, of Vancouver, Canada
and forms part of a new 43-101 report co-authored by Dr. Tucker Barrie and was
released in February, 2009.
The Giroux
Consultants' combined indicated and inferred resources at a cutoff grade of 2%
zinc were calculated to be 10.2 million tones grading 3.0% zinc, 1.0% copper,
7.0 g/t silver, 0.2 g/t gold consisting of an indicated resource of 5.1 million
tones grading 3.24% zinc, 1.12% copper, 7.8 g/t silver, 0.2 g/t gold and an
additional inferred resource of 5.1 million tones grading 2.8% zinc, 0.96%
copper, 6.2 g/t silver and 0.19 g/t gold.
Moreover,
prospecting and follow ups that include detailed mapping and detailed
magnetometer survey were carried out that covered about 350sq.kms in South West
of Koken, Aradaib, Serarat and South of Halay in the Kerkebet License Area.
Eritrea-China
Mining Share Company
Exploration works
that include tunnel sampling are underway in Augaro and the company is preparing
to work jointly with Sahar Mineral Corporation.
Beijing Donia Company
Beijing Donia is
currently working on its license areas namely Woki,
Defere, Agume and Adi Kenatib. The main interests of the company are Iron and Copper. The
exploration works include geological mapping and geochemical sampling,
trenching, Rock chip sampling and magnetic survey and will be followed by
drilling.
Andiamo Exploration Limited
This is one of the
new companies which was granted license in July 2009. It's active around Haikota. So
far Target areas are being refined for EM Geophysical studies and regional and
detailed mapping, rock and chip sampling in some pre selected areas are
underway.
South Boulder Mines Limited [ ASX:STB ]
South Boulder
Mines is a new entrant to the growing mining community in Eritrea and it's the
first of its kind in that it is focused in potash project in the Colluli, Danakil
area of South-East of Eritrea.
So far five
historic hole collars have been identified. Previous (historic) drilling was of
a reconnaissance nature only. Less than
10% of the project area has been explored with drilling. Logistical preparation and minimal field work is
on progress.
London Africa Limited (Prospecting
License)
This is a private UK company and
its prospecting Licence covers 1562km2 and work has so far identified several
VMS and Gold Prospects.
Gippsland (Prospecting Licences)
It covers 3 licences covering 300km2 in the Northern most of Eritrea. The area is Prospective
for VMS deposits and gold deposits so far the company has come out with
encouraging results that warrant further investigation.
|